1- DESCRIPTION
PRODUCTION; ISO 9001:2008 - ISO 14001:2004 standards are applied.All materials used areTSE
certified.
SYSTEM; PREFABRİKPLUS constructions may be applied in every kind of settlement plan where the
length and width are multiples of 125 cm depending on utility purpose and requirements.Since a special
non-welded screwed system production and installation technology is used, it provides advantage with more
than one disassembly and installation features.
CARRIER SYSTEM; main carrier construction is made of galvanized plate and consists of special section
wall connection members processed from roll former machine,wall construction, roof joints and purlins and
crosses. When necessary as a result of technical calculations, the wall thickness and width of the profile may
be altered and a column supply may be performed.
STATIC CALCULATIONS ;The static calculations,which are required in accordance with the climatic
regional conditions in the location where the construction would be built and the utility purpose of the
building, shall be performed in compliance with the values set forth under the standards.
ISOLATION; Taking into consideration the conditions of the climatic region where the construction would
be made, it is detailed in a manner where it would provide the isolation values recommended underTS 825.
CALCULATIONS
Snow load K80 kg/m 2 (may vary depending on the climatic conditions of the region to be installed in.)
Speed of wind 102 km/hour
Earthquake zone 1st degree Earthquake zone.
Chassis load capacity 200 kg/m 2 (for multi storey buildings)
Wall isolation K:0,50W/m 2 K) in compliance with the conditions of 3rd climatic region .
Roof isolation K:0,40W/m 2 K) in compliance with the conditions of 2nd climatic region.
2- BASEMENT
The concrete shall be placed in compliance with the ground concrete plan to be given by YEDİTEPE
PREFABRİK.The design of the basement, technical calculations,ground concrete,ground isolation,ground
coating shall be undertaken by the employer.Asteel mesh basement shall be prepared on hardened ground.
The EMPLOYER shall be responsible in case the concrete is not laced in compliance with the concrete plan
to be given by YEDİTEPE PREFABRİK and in case the explanations given in the concrete plan are not
taken into consideration.The building is fixed to the ground concrete by use of anchors and steel pegs.
3- BETOPAN
•Definition It is the construction plate which combines in its body the positive properties of wood and
cement, and which could offer the required solutions for the various demands of the various parts of the
constructions. It does not swell inside the water,does not become mouldy, is not affected frommoisture, it is
not plastic, it does not allow infestation, inflammable
•BetopanTechnical Data Density :~1300 kg/m 3 .Resistance to burning: Inflammable (B1 DIN 4102 Part 1)
Heat conductivity coefficient ( 10˚C dry) :0.15W/mK ,Bending resistance perpendicular to the surface:9
N/mm 2 ,Elasticity module in bending perpendicular to the surface:4500 N/mm 2 .
4- OUTERWALL
•Wall height 2500 mm. •Outer wall thickness 100 mm
•Panel Formation Pressing system wall fixed by use of glues.
•Panel Formation (multi Storey Building) Carcass system panel manufactured from C and U sectioned
profiles which were made of high standard galvanized plate,processed in roll-formmachines.Material
thickness is 1-3 mm according to static calculation.
•Outer wall outer coating 8 mm thickness cemented flake board ( Betopan) CE certified
•Outer wall inner coating. 8 mm thickness cemented flake board ( Betopan) CE certified.
Isolation for 1st climate region 80 mm thickness polystyrene foam (10 kg/m3 – B-1 class)TS 7316
•Isolation for 2nd climate region 80 mm thickness polystyrene foam (14 kg/m3 – B-1 class)TS 7316
•Isolation for 3rd climate region 80 mm thickness polystyrene foam (16 kg/m3 – B-1 class)TS 7316
•Outer wall outer coating paintAcrylic paint (two layers)
•Inner wall inner coating paint.Plastic paint (two layers)
•Wall connection members H,U, triple and corner connection materials which were made of high standard
galvanized roller plate,processed in roll-formmachines.Plate thickness varies between 1,2-2 mm according
toTechnical calculations.
5- INNERWALL
•Wall height 2500 mm. •Wall thickness 60 mm
•Panel Formation Pressing system wall fixed by use of glues.
•Panel Formation (Multi Storey Construction) Carcass system panel manufactured from C and U sectioned
profiles which were made of high standard galvanized plate,processed in roll-formmachines.Material
thickness is 1-3 mm according to static calculation.
•Inner wall coating. 8 mm thickness cemented flake board ( Betopan) CE certified.
•Isolation for 1st climate region 44 mm thickness polystyrene foam (10 kg/m 3 – B-1 class)
•Isolation for 2nd climate region 44 mm thickness polystyrene foam (14 kg/m 3 – B-1 class)
•Isolation for 3rd climate region 44 mm thickness polystyrene foam (16 kg/m 3 – B-1 class)
•Inner wall inner coating paint Plastic paint (two layers)
•Wall connection members H,U, triple and corner connection materials which were made of high standard
galvanized roller plate,processed in roll-formmachines.Plate thickness varies between 1,2-2 mm according
toTechnical calculations.
6- ROOF
CoatingTrapeze rolled trapeze plate in 27/200 form. In residences painted trapeze plate.
Purlin Profile processed in roll former machine,manufactured from galvanized plate.
Carrier system Steel joint manufactured by use of non-welded construction technology by use of U and C
sectioned profiles which were processed in high standard galvanized plate with 125 cm intervals.Plate
thickness varies between 1,2 and 3 mm according to technical calculations..
Isolation materials for 1st climate region 80 mmThickness roll glass wool. (12 kg/m 3 )
Isolation materials for 2nd climate region 100 mmThickness roll glass wool. (12 kg/m 3 )
Isolation materials for 3rd climate region 160 mmThickness roll glass wool. (12 kg/m 3 )
•Eave Eave made of 17 cm wide galvanized plate.
•Rain landing system Pvc rain stream and landing.Streaming is not applied in the regions where the snow
load is extreme.Rain landing system is out f the scope of guaranty.
7- SUSPENDED CEILING
•Suspended ceiling construction Omega profile which is specially formed,manufactured from galvanized
plate mounted on roof joints.
•Coating 12,5 mmThick white plaster board plate.
•Connection profiles.Electrostatically white painted aluminiumT profile.
•Ceiling coating paint Plastic ceiling paint.White.
8- DOORS
•Outer door. 90x200 cm.dimensions,Pvc or metal door.Steel door in residences.
•Inner door. 88x196 cm.dimensionsAmerican panel door.Frame/Cornice;Specially shaped metal frame
and cornice.Lock /arm;knob head.Grey or yellow door knob
9- WINDOWS
•Window In the dimensions set forth in the plan,PVC cutting.Glass;4+9+4 mm double glass.Application is
performed by the cornice made of Galvanized plate.
•Transom window 60x40 dimensions PVC cutting.Glass;4 mm single frosted glass.Application is
performed by the cornice made of Galvanized plate.
10- ELECTRICAL INSTALLATION – Flush mounted.
•Capacity 220 volt. •Sockets and buttons VİKO - Classic
•Cable (Sockets) NYA3x2,5 mm. •Cable (Illumination) NYA2x1,5 mm
•Illumination armatures In Normal spaces:1*40TMS armature. In residences:circular luminary.
•In wet spaces:Round glop.Outer door top;Outer glob.
•Fuse and Fuse box In sockets:16-32 amp. In illuminations 10 amp.Fuse box; surface mounted.VİKO brand.
•Any use of heater or air conditions etc must be indicated in the project.
•Telephone installation One piece shall be installed to saloon part of the building.
•Door bellWireless bell is available in residence purpose constructions.
other Installation of Door automat, electrical board,main line connection,Tv/Antenna installation shall be
undertaken by the employer.
11- SANITATION SYSTEM – Flush mounted.
•Pipes (Clean water) PPRC pipe.FIRAT,BERKE Brands
•Lavabo 40x50 cm. lavabo with legs.EURROSER brand.Lavabo without legs in constructions for office and
work site.
•Shower tray 80x80 cm. acrylic shower tray.AKPLAST brand.
•Wc Seat With ceramic reservoir (plastic reservoir in office and work site constructions),plastic cap in
European style.EUROSER brand.Turkish style wc seat.EUROSER brand.Plastic reservoir.TEMA brand.
•Kitchen installation Hot and cold water installations will be undertaken.Lower cupboard with 120*50 cm.
dimensions chrome kitchen sink will be delivered.Lower and upper kitchen cup board and bench will not be
constructed.
•Stopcocks and faucets Lavabo;Lavabo faucet has eagle type lavabo installation,Shower ;Shower faucet is
eagle type wall-mounted,bidet nozzle;wall-mounted.Turkish style wc ;Long faucet is wall -mounted.Unless
not stated in office and work site construction plan,no hot water installation is performed.
•OtherWaste water installation,heating installation,main lines and connections,water meter and connections
will be undertaken by the customer.
12- PAINT
•Outer facade coating paintAcrylic outer facade paint. (two layers)
•Inner facade coating paint Plastic inner facade paint (two layers)
•Ceiling coating paint Plastic ceiling paint.Colour white.
•Joint,purlins and panel carcass.Not lined because galvanized construction technology is used.
•Wall connection members (h,double, triple and corner posts) Rapid white liner.
•Forehead and front eaves Rapid final layer white paint.
•Grouting Outer facade coating grouting;acrylic mastic,
13- MEZZANINE FLOOR SYSTEM – For Multi Storey constructions.
•Construction of mezzanine floor Mezzanine floor constriction is applied by use of cage systems
manufactured from special production,made of galvanized roll plate.
•Top Coating 16 mm Cemented flake board (Betopan)
•Ceiling Coating 12,5 mmThickness white plaster board plate.
•Suspended ceiling construction Omega profile specially shaped made of Galvanized plate.
•Connection details
•Isolation 80 mmThickness roll glass wool. (12 kg/m 3 )
•Load carrying capacityTaking into consideration the utility purpose of the building,a mobile load value is
being calculated in accordance withTS 498.Standard constructions ;200 kg/m 2 .
14- STAIRS- For Multi Storey constructions.
•Carcass Steel skeleton obtained from box profiles. •Step coating 16 mm betopan coating.
•Banister Box profile. •Option Optionally,wooden stairs and banisters are available.
15- THEWORKS UNDER THE LIABILITYOF THE EMPLOYER
•Transportation andTransportation insurance shall belong to the customer.
•Ground concrete, every kind of excavation and environmental arrangements
•Covering the needs of accommodation, travelling and catering of installation staff in the works out of
Istanbul.
•Ground and wall coatings (Schappe, ceramic, faience, carpet etc)
•Obtaining the plans,project and eagle permissions for the establishment of the building
•Performing any and all kinds of isolation works between the prefabricated building and ground concrete
•Performing computer and UPS installations and installing the armatures
•Electrical main distribution board (electricity meter,conduit box,main fuses etc) and grounding line
•Performing the outer connections except from prefabricated building (Electricity,drainage,domestic water
etc)
•Kitchen cupboards, flyswatter,banister,bath cupboards,mirror, soap holder,paper holder etc..
•Heating and cooling installations (central heating system air condition etc)
•Supply of electricity and if necessary crane and scaffold to be used during the Installation
•Providing anti-theft security of prefabricated construction materials in the work site
•Performing the installations of sanitary ware and armatures after the installation
16- OTHER No unit/member which ha snot been specified in technical specifications can be demanded by
the customer.The materials written in technical specifications shall be valid on the condition that they are in
the plan.
YEDİTEPE PREFABRİK HASTHE RIGHTTOMAKEANYKIND OFALTERATIONS IN
TECHNICAL SPECIFICATIONS.
y
14
LIGHT PREFABRICATED CONSTRUCTIONS
TECHNICAL SPECIFICATIONS